
Races
Negotiate
Legislative Decree No. 33 of 14 March 2013 reorganised the obligations of public disclosure, transparency and dissemination of information by public administrations and private law entities whose activities are financed by public administrations. This page brings together the information required to be published, in the format indicated by the decree.
The entire section is dedicated to the free consultation, by citizens, of information concerning the organisation and activities of the body, which can be consulted directly, without any need to be identified by means of a user name and password. The information published is continuously updated in accordance with the provisions of Legislative Decree No 33 of 14 March 2013 and subsequent updates.
Contractor: Cipiemme Srl
Procedure description: Execution and implementation in accordance with the law of building works to be carried out on two buildings
Lot 1 - Extraordinary maintenance works consisting of the demolition and reconstruction of internal floorboards with a metal structure and fibre cement slabs to improve the efficiency of the distribution of laboratory spaces. Demolition of toilets for the construction of a new laboratory. Installation of mobile glass partitions to divide the rooms. Replacement of internal doors and revision of window frames. No external modifications are planned. Plant engineering will be integrated.
CUP: D54D23003780006
CIG - Lot 1: B0B76AC636
Amount (VAT included): 387.465,36 €
Contractor: Cipiemme Srl
Procedure description: Execution and implementation in accordance with the law of building works to be carried out on two buildings
Lot 2 - Extraordinary maintenance works consisting in the construction of an aerated crawl space, demolition of masonry boards and construction of internal partitions with a metal structure and fibre cement sheets to improve the efficiency of the distribution of laboratory spaces. Supply and installation of internal doors for the new premises. Abatement of steps and construction of pedestrian ramps to overcome internal height differences. No external modifications are planned. Plant engineering will be integrated.
CUP: D54D23003780006
CIG - Lot 2: B0B76AB563
Amount (VAT included): 174.323,32 €
letter of invitation building interventions Bergamo and Magenta
RUP validation determination construction projects Bergamo and Magenta